Collection: Kelmarsh

20.04.2025 - 21.04.2025

Portable generators are only allowed during stand build and dismantle

INSTALLATION COMMENCES TWO WEEKS PRIOR TO EVENT START DATE THEREFORE ORDER AND PAYMENT TO BE RECEIVED NO LATER THAN TWO WEEKS PRIOR TO EVENT START DATE TO AVOID A 20% SURCHARGE

CEEFORM SOCKET ADAPTORS.

To comply with regulations, we terminate all supplies using Ceeform (caravan style) sockets and connectors
13A square pin sockets are not deemed suitable for outside use. As such you should ensure your equipment has the appropriate
ceeform plug for connection, or you have your own adaptor to convert from 16A ceeform to 13A square pin.
Whilst we do not condone the use of such adaptors, we realise this may be the only feasible way for you to connect your appliances,

and as such these are available to pre order below or can be purchased on site (subject to availability)

Supply times: Approximately 1:00 PM on the day prior to the event start date, continuing through to approximately 8:00 PM on the final day of the event.

Electricity Supply Typical load suggestions

Led spotlights 10w (0.05Amps) per spotlight
Laptops / PDQ / Phone chargers 24w - 100w (0.1 - 0.5Amps) per item
LED floodlight/Fluorescent lighting 50w (0.2Amps) per fitting
Fridges / Freezers 250w-500w (1-2Amps)
Hairdryer 1500–2000w (7-9 Amps)
Kettle/ Boiler/ heater etc. 3000W (12.6 Amps)
All electrical appliances should display their consumption in Watts or amps on the silver product information sticker, the above is a rough guide of common ratings found on that type of appliance.